Excavations

Back to Tshipi Gallery

  • Excavation for storm water water sump
    Excavation for storm water water sump

    Excavation for storm water water sump

  • Excavator working the storm-water sump
    Excavator working the storm-water sump

    Excavator working the storm-water sump

  • Plant and construction lay-down area (Mamatwan dumps to the top left of the photo)
    Plant and construction lay-down area (Mamatwan dumps to the top left of the photo)

    Plant and construction lay-down area (Mamatwan dumps to the top left of the photo)

  • Rail loop taking shape
    Rail loop taking shape

    Rail loop taking shape

  • Removing topsoil
    Removing topsoil

    Removing topsoil

  • Second phase of railroad construction, laying a good well compacted calcrete foundation. These rails need to last for decades
    Second phase of railroad construction, laying a good well compacted calcrete foundation. These rails need to last for decades

    Second phase of railroad construction, laying a good well compacted calcrete foundation. These rails need to last for decades

  • Tshipi rail foundations showing existing Transnet railway in background
    Tshipi rail foundations showing existing Transnet railway in background

    Tshipi rail foundations showing existing Transnet railway in background