Tshipi Construction & Progress Update

Back to Tshipi Gallery

  • Rail Tamping
    Rail Tamping

    Rail Tamping

  • Load out station foundations
    Load out station foundations

    Load out station foundations

  • Proud managers at Tshipi<br/>From left to right: Takalani Kwinda (Mining Superintendent), Ezekiel Lotlhare (General Manager), Pravin Sookdeo (Plant Superintendent)
    Proud managers at Tshipi<br/>From left to right: Takalani Kwinda (Mining Superintendent), Ezekiel Lotlhare (General Manager), Pravin Sookdeo (Plant Superintendent)

    Proud managers at Tshipi
    From left to right: Takalani Kwinda (Mining Superintendent), Ezekiel Lotlhare (General Manager), Pravin Sookdeo (Plant Superintendent)

  • Concrete batch plant
    Concrete batch plant

    Concrete batch plant

  • Load out station foundation
    Load out station foundation

    Load out station foundation

  • Electrical panels undergoing factory acceptance testing
    Electrical panels undergoing factory acceptance testing

    Electrical panels undergoing factory acceptance testing

  • Panels being assembled
    Panels being assembled

    Panels being assembled

  • Load out station assembly of components
    Load out station assembly of components

    Load out station assembly of components

  • Load out station track work complete and vertical columns erected
    Load out station track work complete and vertical columns erected

    Load out station track work complete and vertical columns erected

  • Open pit has reached the clay layers - only two more benches until ore
    Open pit has reached the clay layers - only two more benches until ore

    Open pit has reached the clay layers - only two more benches until ore

  • Electrical substation buildings
    Electrical substation buildings

    Electrical substation buildings

  • Blast hole drilling in progress
    Blast hole drilling in progress

    Blast hole drilling in progress

  • Tshipi staff happy to welcome Transnet
    Tshipi staff happy to welcome Transnet

    Tshipi staff happy to welcome Transnet

  • Ore transportation being tested
    Ore transportation being tested

    Ore transportation being tested

  • Shunting the first 104 wagon train into Tshipi's siding. <br />The second trail arrived a day later on 11 September
    Shunting the first 104 wagon train into Tshipi's siding. <br />The second trail arrived a day later on 11 September

    Shunting the first 104 wagon train into Tshipi's siding.
    The second trail arrived a day later on 11 September

  • Testing the rail
    Testing the rail

    Testing the rail